Completed projects
These recently completed projects have improved system reliability.
Replaced two aging steel lattice towers with four steel monopoles and separated two supply lines.
Completed: 2014
Converted a section of overhead distribution line to underground between NE Dolphin Drive and NE North Street.
Completed: 2022
Installed approximately two miles of new underground distribution cable between Bucklin Hill Road and NE Oddfellows Road.
Completed: 2017
Installed an underground distribution line along Eagle Harbor Drive and converted the overhead distribution system to underground along Wyatt Way NW.
Completed: 2016
Converted a section of overhead distribution line to underground to connect to an underground line on Bucklin Hill Rd.
Completed: 2020
Relocated utility poles to accommodate a City of Bainbridge Island road improvement project and installed tree wire to improve electric reliability.
Increased the electric capacity of the existing line and replaced poles and equipment to support the higher capacity line.
Completed: 2016
Replaced 0.36 miles of electric wire with tree wire between Lynwood Center Road NE and Blakey Avenue NE.
Completed: 2023
Replaced approximately 4,000 feet of existing overhead wire with tree wire betweeen NE Day Road and Miller Road NE.
Completed: 2018
Reconfigured overhead electric lines to reduce exposure to falling tree branches, installed tree wire and replaced 19 utility poles between Miller Road NE and N Madison Avenue NE.
Completed: 2016
Replaced several aging utility poles and the existing electric wire with tree wire, where feasible, between Komedal Road NE and Phelps Road NE. Installed underground cable between Running Springs Place NE and Selfors Lane NE.
These improvements increase the Island’s electric reliability by adding redundancy to the system and allowing crews to restore power more quickly during outages.
We began construction in July 2023 and completed work in February 2024.
Completed: 2024
Rebuilt the overhead distribution line between Phelps Road NE and Sunrise Drive NE from a single-phase line to a 3-phase line using tree wire.
Completed: 2022
Converted approximately one mile of overhead distribution line to underground between NE Koura Road and NE Tolo Road.
Completed: 2018
Rebuilt the Port Madison Tap between Lemolo and the Port Madison Substation with larger wire to increase capacity and replaced some existing wood poles with taller wood poles. Replaced approximately 1.4 miles of existing overhead distribution line with specialized tree wire.
Completed: 2015