NE Lafayette Ave rebuild and tree wire

This project took place in the vicinity of NE Lafayette Ave and Washington Ave NE between Phelps Road NE and Sunrise Drive NE. The project was completed in 2022. 

The project’s goal was to increase electric reliability in the area by rebuilding the overhead distribution line from a single-phase line to a 3-phase line system using tree wire.